9 September 1854 - Test run, 12 September 1854 - First official passenger run
Builder Information
Builder
Boiler: Langlands Port Phillip Foundry Assembly: Robertson, Martin & Smith
Build date
1854
Cost
£2,700
Wheel Information
Gauge
Broad: 1,600 mm (5 ft 3 in)
Configuration
2-2-2WT
Steam Boiler Information
Power output
30 hp (22.371 kW)
Top speed
25 mph (40.234 km/h)
Photos
Class List
Name
In Service
Withdrawn
Condition
2-2-2, Dusty Bob
12 September 1854
Built for the opening of the first railway as ordered locos had not arrived yet. Sold to Evans, Merry & Company (£300) - 8 August 1857. Used in construction of Pier at Williamstown & Ballarat - Geelong line. Abandoned at Lethbridge quarry - 6 September 1861